COUPP-2L 4kg Bubble Chamber Experiment

COUPP 4-kg Physics Results:
  • Jeter Hall - Fermilab Joint Experimental Theoretical Seminar, 19 March 2010
  • Eric Dahl - UCLA DM2010 Talk, 26 February 2010
  • Eric Dahl - Fermilab Astrophysics Seminar, 22 February 2010
  • DS Of Interest for SNOLAB Review:
  • Phase I Run Plan
  • Phase I MSDS Sheets
  • Phase I Hazard Analysis
  • Emergency Shutdown Procedure
  • Lab Coordinator Cheat Sheet
  • Process Flow Diagram
  • Single Line Electrical Distribution Document
  • Instrumentation Wiring Document
  • SNOLAB Shielding Design Work
  • Other Links:
  • COUPP-2L Detector Photographs
  • COUPP Deep Site Deployment Plan 31 March 2010
  • Index of Engineering Documents
  • Index of Operations Procedures
  • Logistical Planning Documents
  • COUPP-2L 16 April 2010 Fermilab PPD Review
  • Information on COUPP Network Connected Devices at SNOLAB
  • Last update of this page was Monday May 10, 2010 20:45:00 CST
    mike@fnal.gov